2012-2014 Pahang Selangor Raw Water Transfer Project
-
Involves two water transfer tunnels stretching 44.6km, the longest and biggest in Southeast Asia and Sixth Biggest in the world, cater the needs of the population in the Klang Valley.
-
We work together with Shimizu-Nishimatsu-UEMB-IJM Joint Venture on the tunnel boring machine. We conduct the splicing joint for the conveyor belt system of the Robbins Tunnel Boring Machine.
-
From year 2012 till 2014, we have conducted 700++ hot vulcanizing joint for the steelcord and fabric conveyor belt in the Robbins TBM on 3 sites.
Other Album